Page 80 - 卫星导航2021年第1-2合期
P. 80

Cheng et al. Satell Navig             (2021) 2:2                                         Page 8 of 12





            Construction of a gridded horizontal velocity feld  geological areas, such as the Chuandian and Qinhai
            The selection of sample points is important to the   Tibet subplates, higher grid resolutions of 30′ × 30′
            IDW performance. Usually at least four sample points   and 15′ × 15′ were applied. The precisions of the whole
            that are surrounding and closest to the point of inter-  velocity field in the E, N directions were 0.78  mm/a
            est are selected. Two common methods for search-  and 0.95 mm/a, respectively.
            ing such sample points are the linear search and the
            area search. In this study the circle search method,   Maintenance of the CGCS2000 with a linear velocity feld
            which belongs to the category of area search, was used.   Efect of inconsistent frames on a multi‑day solution
            According to the distribution of the sample points   Generally, GNSS observations are processed in a ground-
            used in this study, most of them were within the circle   based frame that is consistent with the space-based frame
            with a radius from 1° to 3°. Thus the searching process   that GNSS satellites are associated with. Te ground-
            started from the radius of 1°. If there were more than   based frame is determined by the control points selected
            four sample points within the circle, the interpolation   from the reference stations used in the construction of an
            was performed, otherwise the searching process con-  ITRF. Te space-based frame is determined by the earth-
            tinued with the search radius of 2°, then 3° if needed.   fxed  coordinates  of  GNSS  satellites  in  diferent  ITRFs
            Generally, the larger the radius of searching circle, the   (see Table 1), and provided in IGS satellite ephemerides.
            weaker the correlation between the sample points and   When a solution is to be obtained from multi-day GNSS
            the interpolation point and the poorer the accuracy of   observations, the common practice is to obtain single-
            the interpolated result will be.                  day solutions frst, then all single-day solutions are com-
              The results of a 1° × 1° gridded velocity field in main-  bined in the fnal adjustment. If the combination of these
            land China were constructed using the above proce-  daily solutions cannot remain the consistent between
            dure. It should be mentioned that in some complicated   the space-based frame and the ground-based frame,












































              Fig. 7  Vectors of the diferences in the coordinates at the national GNSS stations that have the value larger than 10 cm obtained from the
              quasi-stable adjustment and plate movement
   75   76   77   78   79   80   81   82   83   84   85