Page 140 - 卫星导航2021年第1-2合期
P. 140

Liu et al. Satell Navig             (2021) 2:6                                           Page 7 of 17





























              Fig. 4  Estimated phase and code DISBs between two Trimble Alloy receivers



























              Fig. 5  Estimated phase and code DISBs between Trimble Alloy and Javad TRE_3 receivers



            Table 4  Phase and code DISB estimates for both the same and diferent receiver types
            Receiver types  Baseline    Phase DISB in cycles                   Code DISB (m)
                            distance
                                        B1I                B3I                 B1I               B3I
                                        AVE       STD      AVE        STD      AVE       STD     AVE     STD
            Trimble Alloy#1  Zero         0.000   0.002      0.000    0.002    − 0.08    0.07    0.01    0.04
            Trimble Alloy#2
            Trimble Alloy#1  Short      − 0.008   0.015     − 0.001   0.016    − 0.28    0.26    0.25    0.18
            Javad TRE_3
            Trimble Alloy#1  Zero       − 0.001   0.003     − 0.001   0.004    − 0.03    0.20    0.29    0.09
            iGMAS #1
            iGMAS#1         Short         0.002   0.009      0.003    0.014    − 0.03    0.39    0.11    0.27
            iGMAS #2
            Javad TRE_3     Short         0.009   0.014     − 0.003   0.014      0.23    0.30    0.03    0.16
            iGMAS#1
   135   136   137   138   139   140   141   142   143   144   145