Page 87 - 《中国电力》2026年第3期
P. 87

崔长江等:英国政府驱动的新能源差价合约设计及对中国的启示                                           2026  年第 3 期



                  技术, 2024, 18(1): 14–27.                           electricity from renewable sources?[J]. Renewable Energy, 2012, 43:
                  SHANG Nan , GU Weide, LIU Shuangquan , et al. Review of typical  383–388.
                  modes  for  the  construction  of  southern  regional  power  market:  [29]   GAO  M  Z,  FAN  C  T,  KAI  J  J,  et  al.  Sustainable  photovoltaic
                  theoretical analysis and modeling calculation from the perspective of  technology development: step-by-step guidance for countries facing
                  social welfare[J]. Southern Power System Technology, 2024, 18(1):  PV  proliferation  turmoil  under  the  feed-in  tariff  scheme[J].
                  14–27.                                            Renewable and Sustainable Energy Reviews, 2015, 43: 156–163.
               [20]   KOZLOV  N.  Contracts  for  difference:  risks  faced  by  generators  [30]   Department  for  Energy  Security  and  Net  Zero.  Fit  contract  for
                  under the new renewables support scheme in the UK[J]. Journal of  difference standard terms and conditions[EB/OL](2021-11-25)[2023-
                  World Energy Law and Business, 2014, 7(3): 282–286.  12-29].  https://assets.publishing.service.gov.uk/media/61e04175d3bf
               [21]   WELISCH  M,  POUDINEH  R.  Auctions  for  allocation  of  offshore  7f054db937f6/AR4_Standard_Terms_and_Conditions.pdf.
                  wind contracts for difference in the UK[J]. Renewable Energy, 2020,  [31]   Department  for  Energy  Security  and  Net  Zero.  Contracts  for  diff-
                  147: 1266–1274.                                   erence (CfD): allocation round 7[EB/OL]. (2023-11-16)[2024-12-29].
               [22]   ONIFADE T T. Hybrid renewable energy support policy in the power  https://www.gov.uk/government/collections/contracts-for-difference-
                  sector: the contracts for difference and capacity market case study[J].  cfd-allocation-round-7.
                  Energy Policy, 2016, 95: 390–401.              [32]   Department for Energy Security and Net Zero. Electricity generation
               [23]   荆朝霞, 李煜鹏, 赵昱宣, 等. 能源系统低碳转型背景下的混合电力            costs 2023[EB/OL]. (2023-11-16)[2024-02-10]. https://www.gov.uk/
                  市场体系结构与设计     [J]. 电力系统自动化, 2024, 48(11): 24–36.  government/publications/electricity-generation-costs-2023.
                  JING Zhaoxia, LI Yupeng, ZHAO Yuxuan, et al. Architecture and  [33]   Department  for  Energy  Security  and  Net  Zero.  Contracts  for
                  design of hybrid electricity market system under background of low-  difference  (CfD)  allocation  round  4:  results[EB/OL].  (2022-07-07)
                  carbon  transformation  of  energy  system[J].  Automation  of  Electric  [2024-07-09]. https://www.gov.uk/government/publications/contracts-
                  Power Systems, 2024, 48(11): 24–36.               for-difference-cfd-allocation-round-4-results.
               [24]   马新顺, 文福拴, 倪以信, 等. 有差价合约日前市场中计及风险约束         [34]   Department  for  Energy  Security  and  Net  Zero.  Contracts  for
                  的最优报价策略    [J]. 电力系统自动化, 2004(4): 4–9, 27.        difference  (CfD)  allocation  round  5:  results[EB/OL].  (2023-03-30)
                  MA  Xinshun,  WEN  Fushuan,  NI  Yixin,  et  al.  Risk-constrained  [2024-07-09]. https://www.gov.uk/government/publications/contracts-
                  optimal  bidding  strategies  for  generation  companies  in  day-ahead  for-difference-cfd-allocation-round-5-results.
                  electricity  markets  with  contract  for  difference[J].  Automation  of  [35]   VEENSTRA A T, MULDER M. Impact of contracts for differences
                  Electric Power Systems, 2004(4): 4–9, 27.         for  non-carbon  electricity  generation  on  efficiency  of  electricity
               [25]   赵学顺, 戴铁潮, 黄民翔. 电力市场中风险规避问题的研究                 market[J]. Energy Economics, 2024, 136: 107674.
                  (二)——差价合约分析系统的实现       [J]. 电力系统自动化, 2001(8):
                                                                                作者简介:

                  16–19.
                                                                                  崔长江(1980),男,高级工程
                  ZHAO Xueshun, DAI Tiechao, HUANG Minxiang, et al. Study on
                                                                                师,从事电力市场、电力调度与控制
                  risk  evasion  in  electricity  market  part  two  implementation  of  an
                                                                                等研究,E-mail:gxdljyzx@gx.csg.cn;
                  analytical  system  of  the  contract  for  differences[J].  Automation  of
                                                                                  李煜鹏(2001),男,硕士研究
                  Electric Power Systems, 2001(8): 16–19.
                                                                                生,从事电力差价合约和容量充裕度
               [26]   浙江省发展改革委, 浙江省能源局, 浙江省能源监管办. 关于印发
                                                                                机 制 研 究 , E-mail: 202321014330@
                  《 浙 江 电 力 现 货 市 场 第 六 次 结 算 试 运 行 工 作 方 案 》 的 通
                                                                                mail.scut.edu.cn;
                  知  [A/OL].  (2024-04-07)[2024-07-09].  https://fzggw.zj.gov.cn/art/
                                                                  邓雯丽(1996),女,经济师,从事电力市场研究,
                  2024/4/8/art_1229629046_5287720.html.
                                                                E-mail:wlideng@163.com;
               [27]   广西壮族自治区工业和信息化厅, 广西壮族自治区发展和改革委
                                                                  荆朝霞(1975),女,通信作者,博士,教授,从事
                  员会, 国家能源局南方监管局. 关于印发       2024  年广西电力市场交
                                                                电力市场、综合能源建模与优化、电动汽车充换电设施运
                  易实施方案的通知      [A/OL]. (2024-01-02)[2024-07-23]. http://gxt.
                                                                营、电网规划等研究,E-mail:zxjing@scut.edu.cn。
                  gxzf.gov.cn/wzsy/tzgg_6719901/tzgg/t17786640.shtml.
               [28]   WALKER S L. Can the GB feed-in tariff deliver the expected 2% of        (责任编辑 李博)
                                                                                                           83
   82   83   84   85   86   87   88   89   90   91   92