Page 236 - 《振动工程学报》2026年第3期
P. 236

836                                振   动   工   程   学   报                               第 39 卷

                                                                     nel  test  for  aerodynamic  selection  of  Π  shaped  deck  of
              5 结  论                                                 cable-stayed  bridge[J].  Journal  of  Harbin  Institute  of
                                                                     Technology, 2012, 44(10): 109-114.
                                                                [7] XU F Y, YING X Y, LI Y N, et al. Experimental ex⁃
                  本文以更换斜拉索施工阶段的夷陵长江大桥为
                                                                     plorations of the torsional vortex-induced vibrations of a
              研究对象,通过现场实测和风洞试验相结合的方式,
                                                                     bridge  deck[J].  Journal  of  Bridge  Engineering,  2016,
              对大跨度斜拉桥换索施工期增设临时施工围挡的主
                                                                     21(12): 04016093.
              梁风致振动性能进行了研究,主要结论如下:
                                                                [8] IRWIN P A. Bluff body aerodynamics in wind engineer⁃
                 (1) 基于环境激励方法(仅有风荷载、行人和非                             ing[J].  Journal  of  Wind  Engineering  and  Industrial
              机动车荷载,即微小振幅条件)对夷陵长江大桥主梁                                Aerodynamics, 2008, 96(6-7): 701-712.
              的动力特性进行了实测,大桥主梁频率识别结果与                            [9] 李永乐, 苏洋, 武兵, 等 . 风屏障对大跨度桁架桥风致
              有限元计算结果吻合较好,环境激励微小振幅条件                                 振动及车辆风载荷的综合影响研究[J]. 振动与冲击,
              下主梁的结构阻尼比低至 0.1%~0.4%,远低于规                             2016, 35(12): 141-146.
              范建议值 2%。                                               LI Yongle, SU Yang, WU Bing, et al. Comprehensive
                                                                     effect of wind screens on wind-induced vibration of long-
                 (2) 换索施工期机动车道外侧增设的 2.5 m 高
                                                                     span truss bridge and wind loads of vehicles[J]. Journal
              围挡恶化了主梁的涡振性能:最大竖向涡振振幅增
                                                                     of Vibration and Shock, 2016, 35(12): 141-146.
              大约 0.14 倍,最大扭转涡振振幅增大约 1.6 倍,当阻
                                                                [10] 李春光, 张佳, 韩艳, 等 . 栏杆基石对闭口箱梁桥梁涡
              尼比增加至 1.5% 时主梁换索施工期加设围挡断面
                                                                     振 性 能 影 响 的 机 理[J].  中 国 公 路 学 报 ,  2019,  32
              涡振性能满足规范要求。
                                                                    (10): 150-157.
                 (3) 主梁在换索施工期增设围挡之后驰振、颤                              LI Chunguang, ZHANG Jia, HAN Yan, et al. Mecha⁃
              振临界风速均超过 100 m/s,仍具有较好的气弹稳                             nism of the influence of railing cornerstone on vortex-in⁃
              定性,满足规范要求。                                             duced  vibration  of  closed  box  girder  bridge[J].  China
                                                                     Journal  of  Highway  and  Transport,  2019,  32(10):
              参考文献:                                                  150-157.
                                                                [11] 龙俊贤, 周旭辉, 李前名, 等 . 带高防护结构的边箱叠
                                                                     合梁斜拉桥涡振性能及抑振措施研究[J]. 铁道科学与
             [1] 李宏江 . PC 斜拉桥拉索使用现状及其养护技术进展
                                                                     工程学报, 2021, 18(1): 119-127.
                  [J]. 公路工程, 2014, 39(5): 165-169.
                                                                     LONG  Junxian,  ZHOU  Xuhui,  LI  Qianming,  et  al.
                   LI  Hongjiang.  The  current  service  status  and  mainte⁃
                                                                     Experimental  study  on  vortex-induced  vibration  perfor⁃
                   nance advances of stay cables in prestressed concrete ca⁃
                                                                     mance  and  aerodynamic  countermeasures  for  a  double-
                   ble-stayed bridges[J]. Highway Engineering, 2014, 39
                                                                     box composite beam cable stayed bridge with high pro⁃
                  (5): 165-169.
                                                                     tective structure[J]. Journal of Railway Science and En⁃
             [2] ZHU S Y, YI R, LI Y L, et al. Buffeting reliability of
                   high-rise bridge tower in mountain area based on CNN-  gineering, 2021, 18(1): 119-127.
                                                                [12] 李前名, 李春光, 马行川, 等 . 带高防抛网边主梁斜拉
                   BiLSTM[J].  Applied  Soft  Computing,  2024,  163:
                                                                     桥 气 动 性 能 试 验 研 究[J].  振 动 与 冲 击 ,  2023,  42
                   111872.
             [3] GE Y J, ZHAO L, CAO J X. Case study of vortex-in⁃  (17): 238-244.
                   duced  vibration  and  mitigation  mechanism  for  a  long-  LI  Qianming,  LI  Chunguang,  MA  Xingchuan,  et  al.
                   span suspension bridge[J]. Journal of Wind Engineering   Test  study  on  aerodynamic  performance  of  a  side  main
                   and Industrial Aerodynamics, 2022, 220: 104866.   beam  cable-stayed  bridge  with  high  anti-throwing  net
             [4] HWANG Y C, KIM S, KIM H K. Cause investigation     [J].  Journal  of  Vibration  and  Shock,  2023,  42(17):
                   of  high-mode  vortex-induced  vibration  in  a  long-span   238-244.
                   suspension bridge[J]. Structure and Infrastructure Engi⁃  [13] KOZMAR  H,  PROCINO  L,  BORSANI  A,  et  al.
                   neering, 2020, 16(1): 84-93.                      Sheltering  efficiency  of  wind  barriers  on  bridges[J].
             [5] MENG  H,  CHEN  W  L,  LI  H,  et  al.  The  vortex-in⁃  Journal of Wind Engineering and Industrial Aerodynam⁃
                   duced  vibrations  of  a  triple-box  girder  model  of  a  long-  ics, 2012, 107⁃108: 274-284.
                   span rail-cum-road bridge[J]. Journal of Wind Engineer⁃  [14] HAN Y, MI L H, SHEN L, et al. A short-term wind
                   ing and Industrial Aerodynamics, 2023, 235: 105359.  speed  prediction  method  utilizing  novel  hybrid  deep
             [6] 董锐, 杨詠昕, 葛耀君 . 斜拉桥 Π 型开口断面主梁气动                      learning  algorithms  to  correct  numerical  weather  fore⁃
                   选 型 风 洞 试 验[J]. 哈 尔 滨 工 业 大 学 学 报 , 2012, 44      casting[J]. Applied Energy, 2022, 312: 118777.
                  (10): 109-114.                                [15] 陈政清, 华旭刚, 封周权, 等 . 大型桥梁结构阻尼特性
                   DONG  Rui,  YANG  Yongxin,  GE  Yaojun.  Wind  tun⁃  及 识 别 方 法 研 究 综 述[J]. 中 国 公 路 学 报 , 2023, 36
   231   232   233   234   235   236   237   238   239   240   241